Puffin · Ajax

Budget & project planning

Explore budget & project planning for your Ajax renovation, with focused guides and questions to prepare.

01

Comparing bathroom renovation allowances →

A bathroom quote can change significantly with the vanity, tile, fixtures and glass selected. Compare the allowances as carefully as the total price. A higher fixture allowance can explain a price difference that otherwise looks like a change in labour cost.

02

Bathroom demolition and hidden conditions →

Removing old finishes can reveal conditions that were not visible during the first visit. Discuss how those discoveries will be documented and reviewed before the room is opened.

03

Waterproofing before the finished look →

The visible tile is only one part of a wet-area assembly. Discuss the preparation, waterproofing approach and relevant inspection or testing stages before focusing on the final appearance.

05

A realistic bathroom project programme →

The construction period is only part of the overall project. Design decisions, approvals, product availability and any custom fabrication can affect when the room is ready.

06

Bathroom changes after work begins →

Changing a fixture or layout during construction can affect more than the item being replaced. Dimensions, rough-ins, tile layout and timing may all need to be reviewed.

07

Your bathroom completion checklist →

A completion review should cover how the room works as well as how it looks. Use the agreed selections and scope to guide the walkthrough. Allow enough time to look at the details in good light and discuss anything that needs clarification.

Your next chapter starts here

Let’s make your everyday better.

A name, a number and a starting point. The rest begins with a conversation.

Plan my new bathroom (365) 299-1590
Call (365) 299-1590Start my project